
Mobile. Sustainable. Progressive.
FAM crawler-mounted conveyor bridges were specifically designed for a continuous dynamic operation to streamline the technological process of piling the ore, reclaiming leached stockpiles and creating new ore stockpiles space-efficiently and in a timely manner.
Besides their regular productive deployment in transportation of copper and nickel ores for the dynamic leach-pad systems, FAM mobile crawler-mounted conveyor bridges have been found to be perfectly suitable for a different purpose at landfills for red mud tailings which are created in the extraction of aluminum oxide from the aluminum-containing ore.
Customer: Alcoa of Australia Limited
Project: Dry Tailings Spreader System
Delivery and scope of service:
1x Crawler-mounted conveyor bridge MSB 1440.14
1x Tripper car TC 1050.4
1x Tripper car on crawlers
Material / Output:
Red mude tailings 1200 t/h
Australia
2019
Customer: Alcoa of Australia Limited
Project: Kwinana Residue Filtration Project
Delivery and scope of service:
1x Crawler-mounted conveyor bridge MSB600.8
1x Belt wagon on crawlers BW800.50C
1x Tripper car TC800.3K
Material / Output:
Red mude tailings 600 t/h
Australia
2015
Customer: Minera Escondida / BHP Billiton
Project: Leach Pad System Escondida
Delivery and scope of service:
1x Crawler-mounted conveyor bridge MSB4125.8TC
2x Crawler-mounted conveyor bridge MRB5025.8TC
1x Bucket wheel excavator SR500R4
1x Crawler-mounted spreader ST5000.45
Material / Output:
Copper oxide 4125 t/h; leached copper ore 5027 t/h
Chile
2014
Customer: Wanbao Mining Co., China
Project: Opencast Mine Wanbao
Delivery and scope of service:
2x Crawler-mounted conveyor bridge MSB6500.7TC
4x Tripper car
2x Belt conveyor shiftable GF1800x800M
2x Drive station on crawlers ATS1800
Material / Output:
Copper ore 6500 t/h
Myanmar
2014
Customer: China Coal Technology & Engineering Group
Project: In-Pit Crushing System
Delivery and scope of service:
3x Crawler-mounted conveyor bridge MCB5250.1TW
3x In-pit crushing system FZWB2025 on crawlers
4x Belt wagon on crawlers
Material / Output:
Overburden 5250 t/h
Uzbekistan
2014
Consulting
Maintenance
Modernization
Spare Parts Service
Assembly
Logistics