News

  1. Highlights 2009

    The FAM Group starts into the business year 2009 with a clearly increased order volume of EUR 426 million, thus exceeding the hitherto largest order volume by EUR 93 million achieved in the previous year.
  1. Pos. 11Anlage 100000000018789
    Port installation
    Colombia

    handling system
    2x shiploader SLRQ6600.56/27 OX

    coal 6600 t/h
  2. Top2Anlage 100000000018833
    Port
    Latvia

    handling system
    1x shiploader SL1900.43

    urea 1900 t/h
  3. Top3Anlage 100000000018739
    Port
    Canada

    handling system
    1x shiploader SL10000.25EK

    iron ore 11000 t/h
  4. Top4Anlage 100000000018511
    Port installation
    Germany

    longitudinal stockyard
    stockyard capacity 2x630000 t
    2x stacker-reclaimer STR3000/2500.40

    iron ore 3000 t/h
    coal 2500 t/h
  5. Top5Anlage 100000000018524
    Port installation
    Chile

    handling system
    2x shiploader SL3000.45

    hard coal 3000 t/h
  6. Top6Anlage 100000000018679
    Port installation
    Chile

    handling system
    transport and erection
    2x shiploader SL3000.45

    hard coal 3000 t/h
  7. Top7Anlage 100000000018733
    Port installation
    Colombia

    longitudinal stockyard
    upgrading
    1x stacker ST1500.31SWK

    coal 3000 t/h
  8. Top8Anlage 100000000018174
    Port installation
    Australia

    longitudinal stockyard
    4x stacker-reclaimer STR6000/8000.60

    hard coal 8000 t/h
  9. Top9Anlage 100000000018242
    Port installation
    Chile

    handling system
    1x shiploader SL1000.20/39 OX

    copper concentrate 1000 t/h
  10. Top10Anlage 100000000018417
    Processing plant
    Loading station
    Port
    Germany

    handling system, crushing plant
    mobile
    1x hopper car TW1400.20
    1x roller mill WM0812MH
    1x belt conveyor stationary GF1400x16
    3x belt conveyor stationary GF800x12/8/3
    1x truck loading TL5x250

    hard coal 250 t/h

Port
Latvia

handling system, conveyor system,
longitudinal stockyard
stockyard capacity 220000 t, dedusting plant

2x wagon unloading
WUL25.1700
2x double roller crusher - roller crusher shearing-type
SWB0730
1x hammer crusher
HB1225
1x portal scraper
KP3000.73
1x tripper car
TC1400
1x shiploader
SL3000.39SX
5x belt conveyor stationary
GF1400x400/138/80
6x belt conveyor stationary
GF1600x592/304/300/281/130/103

hard coal 3000 t/h